Neubau Progress: VII

I was really worried that after January, we wouldn’t be able to see our flat again until it finished in May, but in February, Kay visited the flat for an appointment with the tile guys in the bathroom.

He noticed that in addition to the big hole we found in the kitchen, they had also drilled further into the hole outside the kitchen door. Not impressed.

Kay met with the tile guys and told them which direction we wanted the tiles to go. We also decided that since they fit perfectly on the ledge, we would use the black floor tiles on the bathroom ledge above the sink as well.

Kay sent me pictures of how the tiles would be direction-wise and he explained to me that they would be setup subway style as opposed to straight grid lines.

Kay also asked me on the phone if I was really sure I wanted white grouting on the walls, because it would cost more. Yep. I want white, white, white so I can see any dirt or grout on my bathroom walls. I think we can spare the minimal cost of upgrading here.

We also specified that we wanted the darkest grout available for the floor to match the floor tiles. My mother always had a hard time keeping the light grout in her kitchen tiles clean so I definitely didn’t want that to be an issue for us.

The rest of the flat was still kind of a crazy mess. Since they drilled the utility shaft so late, everything was a bit behind in the kitchen installation. We were also exchanging our steamer to upgrade some more, at a special, extra additional cost on us… but whatever. I was going to get my temperature controls!

Kay also snapped a photo of our curtain rails.

Small details like this are something that the company sort of glossed over, but I would wake up in the middle of the night and wonder if we have to pay to install something ourselves or if it comes standard with the flat. I was happy to see them installed.

As you can see, they are the standard double curtain rail in Switzerland. We don’t normally have fancy curtain rods, but instead these minimalistic flush curtain rails with a track for sheer privacy curtains and another for heavier blackout curtains.

Our fuse box was still a hot mess.

Here they’d already marked on the floor which direction the tiles would be laid.

And since he was there, Kay went down to the floor below ours and checked our our kitchen hole from below.

Argh, just what are they doing in the kitchen?

I think this is the flat below ours where you can see they unfortunately had already installed the kitchen cabinets when they realized they’d forgotten the utility shaft.

Well well, no point stressing when there’s nothing we can do. We just had to wait and hope they patch it all up correctly… At least our tiles will be the right color and grouting after asking three times and going to this appointment!

Want to catch up?

Neubau Progress: Kitchen

Our first shared kitchen was a sink, hob and small counter top on one wall of our living/dining area, which actually seems big if you compare it to many New York City kitchens. I was excited when we moved to our current flat with its U-shaped kitchen off the living/dining area, I was very happy to be getting a huge upgrade in counters space. I mean, we’d even have room for our microwave! No more storing it on the dining room table! Hoorah.

At 8.6m2 (or 92.5 sq ft) our new kitchen will actually be much bigger than any kitchen Kay and I have shared during our relationship and while it is no American kitchen, I’m also excited about the size upgrade we’ll be getting in July.

As you can see, the kitchen is actually its own room. Built into this little rectangle, we didn’t think it made sense to leave the door off and have an “open kitchen” because the kitchen is pretty closed off anyway. I admit that I’m looking forward to closing the door off from guests or sleeping spouses! (<- Usually that’s me!)

On wall A we have three windows looking out toward the inner complex, two of which will open and close (the middle one is stationary…) Our cost neutral plan came with some big drawers below the stove on the left, but we decided to upgrade the cabinetry below the sink to also be drawers because we think they’ll be handy and practical for pots and pans.

From right to left you have 3 sets of drawers, then the trash system below the sink and on the far right is the dishwasher. With the choice between Electrolux and V-Zug for kitchen appliances, we easily decided that we would go with V-Zug because the quality is much better.

Adora S from V-Zug

We opted for a slight upgrade on the dishwasher to one of the more eco-friendly models with a few extra modes of operation. It uses less water and electricity and it has fancy features like lights telling you when it’s done. The next higher option had a 19 minute quick clean cycle, but we didn’t think that was worth an extra 700 bucks.

 

GK46TIXS stovetop from V-Zug

We did stay with the standard stove option. We debated for a few months whether or not we wanted to splurge for a ridiculously expensive wok setup, but Kay read reviews that the heating element below the wok would be flat, so it wasn’t really special to have the round wok setup anyway. That and we would have needed to re-do our range hood and cabinet setup. All in all, we stuck with the standard here.

DF-5 range hood from V-Zug

One of our bigger upgrades in the kitchen was actually with the sink. This is the standard sink that came with our flat:

Largo LAX 110 50 (35) from Franke

I wasn’t particularly excited about it and Kay’s parents raved about the sink they bought for their house, so they convinced us to splurge for this amazing sink:

Beach BBX 160 from Franke

Maybe it doesn’t look so amazing here… but it comes in a whole set with colanders and bowls that sit in the rounded part and a cutting board that wraps around the sink for easy veggie chopping/rinsing and a wire wrack to fit into the sink for washing.

Kay’s mother really raves about how well the sink empties and how easy it is to clean, so we splurged a bit here.

Another must-have in the kitchen was a faucet with a spray hose. We had one at our old flat and it is one of the things I miss most in Zürich. Seriously. So we actually “saved” some money by getting this extendable hose faucet on the right rather than a fancier stationary faucet. (Because I plan on cooking a lot in the new flat, yo!)

 Mambo from Franke

Kay’s parents also implored how important and how handy it was to have a dish soap dispenser built into the counter top. Personally, for 137CHF I thought this was something I could live without, but we are planning on selling the place sooner rather than later, so we went for this handy, but unnecessary feature. We’ll see how much I use it!

Nova soap dispenser from Franke

S+R 5101 from Peka-System

Every Swiss kitchen ever has the trash can under the sink. Our standar variation comes with a 35L trash can, 4.5L bio container and four bins for extras like recycling, trash bags, etc. It also includes a tray over the trash system to store other items. I am not the biggest fan of the “open” trash can system without a dedicated lid because in our current flat I feel like it stinks up the whole area underneath the sink, but since this trash system (and hopefully our complex) has a bio setup, I’m hoping we can put biodegradable things in the green container and empty it more often while leaving the 35L trash with non-stinky things.

If you remember, I mentioned that we altered which side of the wall our kitchen door opens on and this was to avoid having the open door cover up the window on wall B. Kay really has his heart set on putting a breakfast table here, but I’m just not sure there’s going to be enough room with the walkway and access to the stove. “We’ll see…” I told him. 🙂

On wall C we have the ovens and a much larger fridge and freezer than what we have right now. Currently we are living with what would be considered a “dorm size” fridge/freezer in the US. I don’t know how I live with so few ice cubes… Seriously, the other day I didn’t have any ice in the house and it made me so anxious.

We upgraded the fridge slightly as well. There were three main V-Zug models to choose from, with the most expensive option having a decreased freezer area and a larger fridge area with a “Fresh Cool Zone” of 0ºC section for vegetables and meat. We (I) decided not to sacrifice actual freezer space for more fridge area, but we did upgrade to a slightly more eco-friendly fridge with a nice soft-touch close that will keep me from yelling at Kay to make sure he’s closed the fridge tightly!

Prestige Eco from V-Zug

The place came with a planned steamer and oven, but we definitely had plans from the beginning to upgrade one of them to include a microwave feature.

Miwell-Combi SL from V-Zug

I’m happy we’ll have the integrated microwave so that I don’t have to dedicate any countertop space for it. Maybe that means the bread maker will win a spot outside the pantry!

Combair-Steam S from V-Zug

After months of having things settled, I also decided that in the end, I did want the fancy built-in temperature control for meat in the steamer oven. Now when we cook things like turkey, we’ll be able to stick a meat thermometer into the oven and it will adjust the temperature of the oven until the meat is cooked to the desired temperature. The steamer oven also comes with a warming drawer so you can put your plates in there before serving food. 🙂

Wall D is where we decided we must add an electrical outlet in each corner so we can plug in coffee makers, toasters, blenders, and more.

As you can probably tell from the photos so far, the kitchen place mocked up how our kitchen will look in our chosen materials. We opted for the very white, very Swiss wooden cabinets, white back splash and walls, dark black “Nero” granite, and dark, almost black tile on the floor. We also raised all the countertop heights by a few cm so they fit better for taller people. I find most of the standard countertop heights in Switzerland to be really short and uncomfortable to work at, as if they were made for petite people, which is strange considering how tall many Swiss are.

We wanted everything to be very classic, timeless and “Swiss” because we don’t want some neon green cabinets stopping people from buying our flat in a few years. I can’t tell you how many people had blue bathtubs and toilets in their houses and it was such a turnoff.

I was so excited to see the 3d model of what our space will look like. It’s nothing too crazy, but I think I’ll really like this kitchen. The only thing that disturbs me is that the cabinets don’t go to the ceiling, so I know I’ll be up there dusting from time to time. But adding extra cabinets to fill up the space would have cost an arm and a leg, so we’ll wait and do that for a forever home.

Kay and I debated a bit about the hue of the LED spots, but finally he gave in and let me have my warm red tones instead of the blue tones, under the condition that he can put blue toned LEDs in the living room. I just didn’t think blue hues make a kitchen and the food look inviting!

With any luck, I might be able to work a small 60cm X 60 cm bar table in the kitchen for Kay to have breakfast at on the days he gets up by himself…

Want to catch up?

Neubau Progress: VI

When we got back from the States after Christmas and New Year, we tried to visit the flat that first weekend only to find out they had finally locked our building with semi-permanent doors. Oh noes! How would we see progress after this point??

Well… are sneaky. We headed back the second weekend in January with the plan of climbing the scaffolding to our balcony. From there we could still enter our flat via the balcony doors, but it was likely that it would be one of the last times we could freely enter the flat on the weekend during construction.

We noticed several holes this time… like this disturbing cutout near the entrance to the kitchen. What are they doing in there??

And this even scarier hole in the ceiling and floor of the kitchen. It looked like they had completely forgotten to build in a utilities shaft in the kitchen in 3 different apartment layouts through all five floors! They only found out their huge mistake when they started installing the kitchen cabinets and appliances in other flats and realized something was missing. Ridiculous!!!

Thankfully we are one of the last flats to be finished so they had delivered our kitchen cabinets and appliances but they hadn’t started installing them yet. To cut through the concrete they need to do it with water, and if you already have your appliances with their electric parts installed, this can only spell big trouble later on. The whole ordeal was really disconcerting.

But hey… look who finally remembered our extra sockets in the kitchen??

As you can see, the delivery of the cabinets and appliances is why all the flats are locked now, which I can’t say bothers me. I don’t want anyone stealing my oven!

Not much changed in the bathrooms since we last visited.

Not much changed in the bedrooms either…

Our bathtub did seem to have more crap dumped in it though. It looked like they were preparing to install the toilets.

Here in the master bath you can see the hot and cold water taps in our double sink as well as the piping for the sink drain. The where the mirror will be mounted will also have a little ledge behind the sink area.

From the bathroom looking to the french balcony…

The only thing really scary was that giant hole they drilled through all the apartment floors. What kind of company forgets to put a utilities shaft in? That’s a pretty big mistake. Below you can see the texture from drilling with the water jets.

Hello down there! (That’ll be office/business space below.) Let’s hope they close that up properly!

Want to catch up?

Neubau Progress: Changing Doors

While our Rohbau phase of building was done, or as our contract manager liked to think… SET IN STONE… we did want to make some intelligent tweaks regarding doors…

Remember what our floor plan looks like?

If you notice up there, in the “Reduit”, the door opens into the pantry closet. Now, I think you all agree that it doesn’t make sense to open a closet door into the closet and lose all that extremely valuable storage space. We had to change that.

But worse was in the kitchen. Because the kitchen was almost closed off without a door, we decided to keep the door option so that we would be able to totally shut off the sights and smells from dinner guests and sleeping spouses. But as the company had it planned, the kitchen door would open and partially block the windows if you left it open, which we plan to.

Well, that didn’t make any sense… so we put in our door requests and below you can see the slightly amended “new plan”.

Now we won’t have to worry about getting into the pantry and our kitchen door will spend most of its life sitting flush against the entry wall in the apartment. We just had to make sure they actually put our door frames in the correct direction!

Want to catch up?

Neubau Progress: V

In December we went back to the flat and they had started plastering our walls. It was a step towards finishing!

Around this time they had also installed (or at least placed) our bathtub and shower basins!

This view is from the bedroom looking toward the hallway.

Here is a shot of the hallway where the built in closets will be placed and all the tubing for the utilities on the left.

Here is the office/guest bedroom update:

Shower basin…

Kay walking through our smoothed over flat…

And the kitchen… which still doesn’t have the bloody extra sockets we asked for in the corner!!

At this point we were kinda pissed about the electrical sockets because they had begun to plaster over everything and our sockets definitely were not there or even marked to be put in. We wrote some unhappy letters at this point.

More of the hallway:

A week or two after this we visited right before we went to America for Christmas and they had laid our floor heating. I took a bunch of pictures for progress reports, but I accidentally wrote over the photos when we were preparing our cameras for our US trip! Sooo sad… A fellow buyer in the complex gave me a photo or two of the floor heating, but you can’t really get the picture of how all the tubes looked laid out next to each other…

It looked something like this in our flat:

(Image via Aubrey Cornfoot)

So you get an idea what the floor heating *would* have looked like… still mad I told Kay to reformat the card. Next house I’ll be more diligent!