Oh my… in October it was time to visit our flat again. Can’t believe I’m just sharing these now, but I have a bit of catching up to do in the next weeks before we move!!
By October not much was happening in the flat aside from some electrical wiring, fitting the tubes into the walls as well as putting in some kitchen venting. Here is the kitchen:
This is the venting in the kitchen. It was exciting to us at the time…
More haphazard wiring…
Living room looking to the entry door.
This is the living room next to the guest bath where we will have the light switches and control for the temperature, hence all the extra tubes. In case you haven’t noticed already, the wiring is a bit different than in the US. It is all stored in tubes so that when the wall is covered up you can pull out the wiring without redoing all the walls in the house. This was not the case in my parent’s addition that we saw in-progress during our visits to the States.
And another view of the guest room to the windows.
Want to catch up?
- Nobody buys a home in Switzerland
- How to rent a flat in Switzerland
- Dreaming the impossible
- How to buy a house in Switzerland
- Shopping for houses
- The World of Neubau
- Flat A vs Flat B: Location vs. Cost
- Paying for Sunshine
- We (I) make a decision
- Our future home: Part I
- How we found our giant terrace
- No Mortgages for Americans? Signing the Contract
- Neubau Progress: I
- Neubau Progress: II
- Neubau Progress: Shower vs. Bathtub
- Neubau Progress: Changing the Electric
- Neubau Progress: Bathroom
- We have a mortgage!